Runway 5-23 Rehabilitation and Airfield Improvements at Grand Strand Airport (CRE)

Runway 05-23 at the Grand Strand Airport (CRE) required a complete rehabilitation effort for the airport’s future development. The project involved a concrete overlay of Runway 05-23 and an overlay of Taxiway A, A1, A4 & A5. Additional work included pavement rehabilitation of a small portion of Taxiway A and A4 and new construction of …

Runway 5-23 Rehabilitation and Airfield Improvements at Grand Strand Airport (CRE) Read More »

Hood Avenue Improvements

This project includes widening and realignment of a roadway corridor along existing Hood Avenue within the Fort Gillem Redevelopment area in Forest Park, Georgia. The design included Hood Avenue and a section of Flankers Road broken up into a 2- or 3-phase construction project. Aulick Engineering addressed the need to implement stormwater measures to minimize …

Hood Avenue Improvements Read More »

Chemical Storage Facility Stormwater Flooding Analysis

Aulick Engineering performed a hydraulic analysis for a Global Specialized Chemical Storage Facility in Houston, Texas. Due to the harmful chemicals handled at the facility, the terminals have two separate stormwater systems. One system collects water and eventually discharges it into the adjacent Galveston Bay. The other system collects potentially contaminated water, routes it to …