Construction Inspection

Commercial Terminal Apron Expansion at Valdosta Regional Airport (VLD)

Aulick Engineering provided full-time Resident Project Representative (RPR) and construction inspection services of the terminal apron expansion. The project involved storm drainage, apron entrance road grading, asphalt paving, apron grading, apron concrete paving, marking removable, re-marking, fencing, erosion control, and grassing. The RPR was responsible for coordination with airport operations and the air traffic control […]

Commercial Terminal Apron Expansion at Valdosta Regional Airport (VLD) Read More »

Cargo Area Development New Apron at Greenville-Spartanburg International Airport (GSP)

With increased freight service for international companies doing business in upstate South Carolina, Greenville-Spartanburg International Airport (GSP) realized the need to develop a new cargo area to serve Boeing 747-800s that operate regularly at the airport. The complete build-out of the site will accommodate parking for up to nine (9) 747-800 aircraft. Aulick Engineering provided

Cargo Area Development New Apron at Greenville-Spartanburg International Airport (GSP) Read More »

Rehabilitate Air Carrier and General Aviation Apron – Phase 2 at Augusta Regional Airport (AGS)

Aulick Engineering provided full-time Resident Project Representative (RPR) services for this rehabilitation project at Augusta Regional Airport. This project involved replacing the existing asphalt apron with P501 concrete and included several phases with different design sections. A critical component of the design was a P-304 Cement-Treated Base Course.  The project included storm drain, P154, P152,

Rehabilitate Air Carrier and General Aviation Apron – Phase 2 at Augusta Regional Airport (AGS) Read More »