The project generally consisted of the design phase for closing Runway 9 and creating an additional 16 acres of developable area where the County plans to construct approximately 60 hangars, ranging from small t-hangars to medium box hangars. In addition, a future area was designed for two large corporate hangars with direct access to the main parallel taxiway. Aulick Engineering provided stormwater and erosion control engineering design services, permitting coordination, and constructability review.