SR 120/Kimball Bridge Widening Project included approximately 1.3 miles of road widening and sidewalk construction. Aulick Engineering performed drainage, MS4 design and compliance, and erosion control design services for the project. As part of the design, Aulick Engineering determined sizing and locations for MS4 ponds, sized drainage pipes, and developed an ES&PCP for the project. MS4 was performed in accordance with the GDOT Drainage Manual dated September 2014. Right of way on project was limited so Aulick had to work with the Client to develop creative solutions for providing stormwater management on the project and also had to research and utilize GDOTs infeasibility criteria for the Project.