This project includes widening and realignment of a roadway corridor along existing Hood Avenue within the Fort Gillem Redevelopment area in Forest Park, GA. The design includes Hood Avenue and a section of Flankers Road broken up into a 3-phase construction project. Aulick Engineering’s analysis addressed the need to implement stormwater measures to minimize the water quantity and quality impacts from the proposed development downstream of the project. Nine (9) wet stormwater detention ponds and six (6) enhanced swales were designed to reduce post-construction runoff to meet pre-construction flows to the extent practical, while also providing required water quality and channel protection. The stormwater team prepared the necessary hydraulic and hydrologic reports, checklists, and cost estimates for the Project. In addition, Aulick Engineering was involved in permitting with the City and received very little review comments. Upon completion of each phase, an as-built analysis was performed to ensure the improvements met the design criteria with regard to water quality, channel protection, post developed peak flow rates, and other non-quantitative matters.